sewn, transparent Organza fabric on steel construction
Height 4.81 m, Running Length 7.88 m
2023
installation at the church Dreieinigkeitskirche, Regensburg
Thanks to Peter Letzel for his support in the realization of the steel construction and thanks to Alois Reicherzer for his support during assembly and disassembly
Thanks to Dr. Maria Baumann, Dr. Gabriele Kainz
Photography: Herbert Stolz and Thoa Weber